Menu
Free tool

Cpk and Ppk calculator

Paste your measurements and enter the specification limits, and the calculator returns Cp, Cpk, Pp and Ppk, with a check of whether the process stayed inside its control limits while the readings were taken.

One per line, or separated by spaces or commas, in the order they were measured. Up to 2,000 readings.

 

With subgroups, the readings are grouped in the order given, so the first ones form the first subgroup.

Leave one limit empty for a one-sided specification. The readings are used for this calculation only and are not stored.

Fill in an example

Results

No point falls outside the control limits of the individuals (X) or moving range (mR) chart. This check uses the limits only, and a control chart can still show runs and trends that it does not look for.

Capability

Cpk, from sigma within1.41
Ppk, from overall sigma1.23
Cp1.61
Pp1.41

The readings

Readings25
Mean10.5436
Sigma within (average mR / 1.128)0.0103
Overall sigma (standard deviation)0.0119
LSL 10.50USL 10.60Mean 10.54

Get the PDF report by email

The two-page report puts these results next to the individuals and moving range charts, with every point and limit drawn, ready to attach to a capability study or a customer reply.

Without the tick, the address is used to send this report and nothing else. The Privacy Policy says what is kept and how to have it deleted.

How the calculator works

Cpk and Cp, from sigma within

Cpk compares the distance from the mean to the nearer specification limit with three sigma, and Cp compares the whole tolerance with six sigma. The sigma here is the variation inside the process from one reading to the next: the average moving range divided by 1.128 for individual readings, or the average subgroup range divided by d2 for subgroups.

Ppk and Pp, from overall sigma

Ppk and Pp use the same formulas with the standard deviation of all the readings, which includes any drift of the mean between subgroups. When Ppk falls well below Cpk, the mean most likely moved during the period, and the cause of that shift is worth finding before anybody adjusts the process.

Stability before capability

A capability index predicts what a process will produce only when the process is stable, meaning that its variation comes from common causes (chance causes) alone. That is why the calculator checks the readings against the limits of the control chart before it reports the indices. SPC ANALYZER draws that chart for every characteristic, and the Lean Six Sigma Green Belt 2.0® course teaches how to read it in the Measure and Control phases of a DMAIC project.

Where capability fits in a Green Belt project

A capability analysis belongs to the third of the nine deliverables of a Green Belt project. The Lean Six Sigma Problem Solving Flow poster maps all nine, and the PDF is free by email.

Chart the same readings in SPC ANALYZER

SPC ANALYZER draws the X-mR or X-bar R chart behind these numbers, flags outliers and missing values, and exports the report to Excel or PNG. The monthly and yearly plans start with a 14-day free trial.